Studio. One editor, one suite, a short list of people I trust.

A small edit and grading suite in Old Fourth Ward: a calibrated monitor, a pair of mix speakers and a door that closes.

The edit suite: a desk with a reference monitor between two speakers in a dark room
Nia Calloway against a white wall

Hi, I’m Nia. I’ve cut films in Atlanta since 2014.

Clip info

Nia_Calloway.mov

Name

Nia Calloway

Role

Film editor and colourist

Based in

Old Fourth Ward, Atlanta

Cutting since

2014

Cuts in

Premiere Pro, DaVinci Resolve, After Effects

Films delivered

214

Next opening

Week of 17 November

How I work. Set once, kept on every project.

If one of these doesn’t suit you, say so before we start.

Preferences

Project defaults

Two rounds of notes

Included on every edit. Most films lock after the second.

Lock date agreed before I start

Written into the quote, and the one date I won’t move.

Footage checked on arrival

Copied, verified and backed up twice the day the drives land.

Weekends off

Messages after Friday 18:00 are answered on Monday morning.

Project files kept for a year

Ask for a re-edit any time in the next twelve months.

How a week runs. Six hours of footage down to the two minutes you keep.

Mon 09:12: Import 214 clips. Copied from the drives, checked and backed up twice before anything is cut. Runtime 06:12:00.

Mon 14:20: Sync and label. Sound synced, every clip named by scene and take. Runtime 06:12:00.

Tue 10:05: Assembly, 6:40. Everything usable, in order. You only see this one if you ask. Runtime 00:06:40.

Tue 17:30: Rough cut sent. A private review link where you leave notes on the frame. Runtime 00:03:10.

Wed 12:00: Notes, round one. Your notes in, answered and recut the same afternoon. Runtime 00:02:48.

Wed 18:45: Fine cut, 2:20. The second link. Most films lock here. Runtime 00:02:20.

Thu 11:00: Picture lock. No more changes to the edit; colour and sound begin. Runtime 00:02:00.

Thu 15:10: Grade and mix. One look across the film, mixed to −14 LUFS for the web. Runtime 00:02:00.

Thu 16:40: Export 6 files. Masters, cut-downs and captions, checked and sent. Runtime 00:02:00.

Brands, channels and directors. Most of them come back.

Eight of my last ten projects came from people I’d cut for before. These are the project files I’ve opened most recently.

Recent projects

Search projects

Name

Client

Last opened

Fernway_LongClimb_v12

Fernway Cycling

Opened 2 days ago

Kerbside_Ep13_selects

Kerbside

Opened today, 09:12

PikePlane_MadeSlow_lock

Pike & Plane Joinery

Opened last week

Marigold_Recruit_30s_v4

Marigold Health

Opened 3 weeks ago

Redbud_Spring_Teaser

Redbud Dance Company

Opened in September

Saltmarsh_Reel2_grade

Wide Sky Films

Opened in August

Tallis_HouseOnTheRidge

Tallis Architects

Opened in July

SlowBurn_final_v3

Ellis Ray

Opened in May

Have footage waiting? Start a project.

Send the drives on Monday. The first cut is in your inbox by Wednesday.

New project

Project name

Your film

Runtime

About 2:00

Deliver by

Pick a date

Create a free website with Framer, the website builder loved by startups, designers and agencies.